33 The manager was _______that the project would be completed on time.
(A) Artistic
(B) automatic
(C) optimistic
(D) dramatic
答案:登入後查看
統計: A(6), B(50), C(407), D(26), E(0) #3740532
統計: A(6), B(50), C(407), D(26), E(0) #3740532