33 The manager was _______that the project would be completed on time.
(A) Artistic
(B) automatic
(C) optimistic
(D) dramatic
答案:登入後查看
統計: A(4), B(19), C(236), D(11), E(0) #3740532
統計: A(4), B(19), C(236), D(11), E(0) #3740532