25. The following event has been made in the Deck Log Book. “1523 Vessel eastbound, crossed
the International Date Line at L 38-25.2 N, _________one day, calendar day would be Jan.15,2008.”
(A) advanced
(B) retarded
(C) skipped
(D) slowed
答案:登入後查看
統計: A(145), B(295), C(113), D(73), E(0) #3136162
統計: A(145), B(295), C(113), D(73), E(0) #3136162
詳解 (共 3 筆)
#6040727
retarded one day表示延遲或推遲了一天,從東半球跨越國際換日線到半球即便慢!
19
0
#7659604
航海日誌(Deck Log Book)中有以下記載:「1523 船舶向東航行,於北緯 38 度 25.2 分跨越國際換日線,______ 一天,日曆天應改為 2008 年 1 月 15 日。」
(A) advanced(提前 / 增加)
(B) retarded(推遲 / 減去)
(C) skipped(跳過 / 跨過)
(D) slowed(減速)
0
0